SPECIFICATION

  • Floor configurations that can flexibly accommodate a wide variety of experimental activities
  • Handling of hazardous materials / high-pressure gases for experimental use permitted

Floor Configuration

Floor Configuration

General Specifications

Water Supply

Connection provided to each unit (25–40A)

Drainage

Two drainage systems provided to each unit (laboratory drainage / general drainage)

  • Laboratory drainage: 100A
  • General drainage: 100A (Excludes some units)

Other

  • Handling of hazardous materials / high-pressure gases for experimental use permitted
    (Types and quantities subject to consultation)
  • P2 / BSL-2 compatible
  • Door dimensions (mm): W 2,500 x H 2,500

BCP Comapatible

  • 1.25 times the strength required under the New Seismic Design Standards
    (Ratio of the superstructure’s ultimate lateral load-carrying capacity to the required ultimate lateral load-carrying capacity)
  • Dual-line extra-high-voltage (66,000 V) power receiving system
  • Power supply maintained for 72 hours after a disaster (15 VA/m2 for leased areas and emergency power for common areas) (Either single-phase or three-phase)
  • Water supply and drainage functions maintained for 72 hours after a disaster (common areas only)
  • Critical equipment installed on 2F or above
    Reinforced-concrete exterior walls, with watertight doors or flood barriers installed at entrances

Other

  • Planned to obtain BELS ☆☆☆☆☆, ZEB READY, and CASBEE Kawasaki certifications
  • 24-hour on-site management (Disaster Prevention Center located on 2F)

Rendering of Leased Space(Skeleton specification allowing a high degree of layout flexibility)

貸室
(Some units are planned to be delivered with fitted-out specifications)